The report on the fire at Eglin Air Force Base’s Climatic Laboratory in July of 2017 has been released. The fire on July 5th, 2017 caused 30 million dollars in damages. A contractor was using an oxy-acetylene torch to remove a corroded steel I-beam causing a refrigerant coil – containing methylene chloride – to burst, which started the fire. No one was injured.