The Florida Department of Transportation will spend about 2 million dollars to make repairs to the two southbound lanes of the Yellow River Bridge on State Road 87. The project is expected to begin today and finish up in the spring of next year. Repairs will be made to the pilings and to the joints where the bridge decks connect. More than 11,000 vehicles travel the bridge each day and drivers can expect lane closures and traffic shifts during the work. Signs and channelization devices will direct boaters through the work zone.
YELLOW RIVER BRIDGE REPAIRS
Oct 28, 2019 | 5:09 AM
Current Conditions: Pensacola, FL, USA
72 °F
Partly cloudy
SSE @ 9 mph
91 %
0.0 in
30
Summary
High
Low
Wind
Precipitation
Sat

Sunny
High:81 °F
Low:68 °F
Wind:SSE @ 11 mph
Precipitation:0.0 in
Sun

Overcast
High:73 °F
Low:63 °F
Wind:NNW @ 12 mph
Precipitation:0.0 in
Mon

Overcast
High:68 °F
Low:58 °F
Wind:NNE @ 11 mph
Precipitation:0.0 in
Tue

Partly Cloudy
High:79 °F
Low:61 °F
Wind:ENE @ 11 mph
Precipitation:0.0 in
Wed

Light rain shower
High:75 °F
Low:59 °F
Wind:ESE @ 16 mph
Precipitation:0.0 in
Thu

Patchy rain nearby
High:75 °F
Low:60 °F
Wind:E @ 7 mph
Precipitation:0.0 in
Fri

Partly Cloudy
High:78 °F
Low:62 °F
Wind:SE @ 9 mph
Precipitation:0.0 in

